Page Two for Sweet 64







Journeys end (for Me) is getting closer. Most of wiring is done. Engine,
clutch, drive line, shocks, etc is done done done done. Top frame is being
fitted for new top. Dash has restored clock, steering wheel and other nice
parts.







Radio install. Just cut holes, run wires and make sure all parts fit. Easier
said than done but it is done. Top is nearly installed also.
Lists, when getting near the end of a job the joy of seeing the list get small
!!!
Probably will not be done done. But I plan on driving to river on Friday.
Made it to the river! Click on pic to see small movie
![]()
Some small leaks, speedometer cable needs replaced. Need to check front
wheels. But all in all a very successful trip
